Draft Design Study Report (DSR) Available for Review

The Municipality of Anchorage Public Works Department, Project Management and Engineering Division (PM&E) is pleased to release a public review Draft of the Design Study Report (DSR) for the Eklutna River Bridge at Old Glenn Highway Replacement Project.

The DSR documents the evaluation of the alternatives for bridge replacement and roadway upgrade and includes the recommended preferred alternative for both.

Open house information is provided on the Public Involvement page at the top.

Report

Eklutna Bridge Replacement DRAFT Design Study Report (DSR) (4.3 mb)

Appendices

EKLUTNA RIVER BRIDGE DRAFT DSR – Appendix A – Design Criteria

EKLUTNA RIVER BRIDGE DRAFT DSR – Appendix B – Plan Sheets

EKLUTNA RIVER BRIDGE DRAFT DSR – Appendix C – Eklutna River Bridge Type Selection Report

EKLUTNA RIVER BRIDGE DRAFT DSR – Appendix D – Traffic, Safety and Alternatives Analysis

EKLUTNA RIVER BRIDGE DRAFT DSR – Appendix E – Concept Report FINAL

EKLUTNA RIVER BRIDGE DRAFT DSR – Appendix F – Public Involvement Plan

 

Posted in Uncategorized | Leave a comment

Latest News

Final Concept Report

The Planning and Zoning Commission (PZC) reviewed the DRAFT Concept Report on November 4, 2013 as an Informational Item.  No changes were required for the Concept Report. 

The Eklutna River Bridge Replacement Project Concept Report has been finalized and is available for review below. Following the Municipality of Anchorage’s Adopted Context Sensitive Solutions (CSS) Policy for Transportation Projects, the Concept Report documents the planning phase and understanding of the problems to be solved. The Concept Report also  summarizes all public outreach activities during the planning and problem identification phase and provides conceptual solutions to those identified problems.

Eklutna River Bridge Concept Report FINAL Web

Final Concept Report Appendices

Eklutna Appendix A CSS Project Nomination

Eklutna Appendix B PI Announcements & Displays

Ekutna Appendix C Meeting Records & Comments

Eklutna Appendix D Design Criteria Table

Posted in Concept Report, Latest News | Leave a comment

Welcome

Welcome to the Municipality of Anchorage’s Eklutna River Bridge Replacement Project website. We are just getting started.

Questions or Comments? Please contact:

Van Le, Planner/Public Involvement Coordinator

R&M Consultants, Inc.

907.646-9659

comments@rmconsult.com