Eklutna River Bridge Replacement Plans are at 95%

The Eklutna River Bridge Replacement project at Old Glenn Highway is at the 95% Design Phase. The plan documents are available below for public and agency review.

You can review and discuss the Design with members of the project team at the

Anchorage Transportation Fair
Wednesday, February 4, 2015
4:00 PM to 8:00 PM
Alaska Airlines Center Auxiliary
3550 Providence Drive, Anchorage

95% Plans in Section

1 – 95% Design General Info

2 – 95% Design Survey Control

3 – 95% Design Right-of-Way

4 – 95% Design Demolition Plan

5 – 95% Design Typical Sections

6 – 95% Design Roadway Improvements

7 – 95% Design Grading Plan

8 – 95% Design Transition, Signing & Striping Details

9 – 95% Design Bridge

10 – 95% Design Landscape Plans

This entry was posted in Uncategorized. Bookmark the permalink.